April 15, 2009 · Construction
Commercial restaurant build-outs pack heavy mechanical, electrical, and sub-slab grease plumbing into tight footprints. Preconstruction air balancing and millwork coordination prevent permit delays at final inspection.
March 12, 2009 · Systems
Auditing high-capacity 480V three-phase electrical distribution, foundation vibration isolation, and overhead crane clearances for the F & C Tool Grinding CNC machining facility.
January 15, 2009 · Underwriting
Auditing wholesale rack supply contracts, bulk transport freight margins, and multi-station real estate valuations for a regional Shell petroleum portfolio in South Texas.
December 15, 2008 · Underwriting
Master planning an interstate commercial travel plaza, high-volume fuel canopy, and IMST market feasibility analysis along the North Houston highway corridor.
December 10, 2008 · Underwriting
Underwriting a two-year-old Texas Gulf Coast Texaco station with a 4,000 sq ft rear warehouse, deli counter, diesel backup generator that ran straight through Hurricane Ike, and seller financing.
November 20, 2008 · Land
Designing the civil site concept and parking master plan for a 52-key Budgetel Inn & Suites along the US-59 Northeast Houston corridor, optimizing drive aisles, fire lanes, and drainage swales.
November 20, 2008 · Underwriting
Auditing underground fuel storage tanks, multi-pump canopy structural integrity, and retail convenience store operations along the North Texas highway corridor.
November 20, 2008 · Underwriting
Reconciling boundary surveys, TxDOT highway right-of-way easements, and underground tank setbacks for an operating Mobil station along a Houston highway corridor.
November 18, 2008 · Construction
Managing the adaptive reuse conversion of a two-story commercial office building into a Quality Inn franchise, coordinating site civil logistics and MEP core modifications.
November 10, 2008 · Construction
Directing the architectural takeoff, MEP physical plant audit, and unbundled franchise PIP budget for a 138-room two-building hotel conversion in East Texas.
October 28, 2008 · Underwriting
Underwriting a combined Shell fuel station, convenience store, and multi-tenant retail strip in Southeast Houston by auditing gallonage margins, cooler sales, and NNN tenant leases.
October 24, 2008 · Construction
Executing heavy civil reconstruction and canopy modernization for a high-traffic retail fueling facility along the Northeast Houston commercial corridor.
October 18, 2008 · Land
Master planning a 14-acre commercial reserve, 4-acre hotel parcel, and 40-room Budgetel Inn hospitality development along the East Texas highway corridor.
October 15, 2008 · Construction
Full tear-off and four-ply built-up roof replacement bid for a 44,500-square-foot commercial facility, separating structural deck contingencies from a five-week installation and draw schedule.
October 14, 2008 · Construction
Coastal hotel renovations fail when cosmetic finishes go up over wet sheathing. Stripping storm-damaged envelope sections, replacing the low-slope roof membrane, and separating insurance scopes from PIP capex protects the asset.
October 8, 2008 · Underwriting
Conducting post-hurricane building envelope forensics, roof membrane assessments, and guestroom PTAC physical plant audits for Travelers Inn along the North Houston highway corridor.
September 30, 2008 · Construction
Auditing a multi-million capital expenditure program for a full-service Hilton tower, unbundling guestroom MEP modernizations, and staging phased atrium public space renovations.
September 24, 2008 · Materials
Directing architectural prototype spatial planning, 84-room three-story commercial hotel building envelope design, porte-cochere structural steel integration, and Choice Hotels franchise capital budgeting along the Northeast Houston growth corridor.
September 22, 2008 · Construction
Evaluating commercial medical clinic tenant improvements, City of Houston life safety compliance, and dedicated electrical laser circuits for Maven Med Spa in the Greater Houston area.
September 18, 2008 · Underwriting
Airport corridor hotels run on volatile transit, airline crew, and distressed-passenger demand. Turning around an underperforming property requires daily flash tracking, strict brand QA punchlists, and direct contract room allocations.
September 18, 2008 · Underwriting
Walking the physical plant, auditing building envelopes, and underwriting franchise conversion capital reserves for an airport corridor hotel near Houston Hobby Airport.
September 15, 2008 · Underwriting
Underwriting the acquisition and Days Inn franchise conversion of a 40-key Interstate 10 roadside hotel by auditing tax receipts, inspecting the building envelope, and pricing the PIP.
September 15, 2008 · Underwriting
Underwriting a combined Texaco fuel station and multi-bay automotive repair center in West Houston, auditing hydraulic lifts, oil-water separators, and fuel equipment.
September 14, 2008 · Underwriting
Auditing canopy structure, dispenser equipment life, C-store merchandise velocity, and inline strip-center leases for a Texaco retail plaza in Houston.