Extended-stay hotels live in a completely different category from standard select-service properties. A standard hotel room is simple: a bed, a television, a desk, and a bathroom. An extended-stay suite is an apartment.
On a 99-room Home2 Suites in Cincinnati, Ohio, the franchise PIP audit focused heavily on the in-room kitchenettes: modular casework, integrated appliances, movable work tables, and acoustic flooring assemblies.
The kitchenette is the single most expensive FF&E line item on an extended-stay PIP. Because of that, domestic preferred vendors treat it as their biggest profit center. They price modular casework at luxury architectural millwork rates because they know hotel owners feel intimidated by the brand's kitchen and utility requirements.
When an owner blindly orders catalog casework through a domestic rep, two things happen. First, they pay a massive distributor markup on every cabinet box, drawer slide, and countertop. Second, when the millwork arrives on site and an electrical cutout or plumbing chase is off by two inches, the distributor blames the installer, the installer blames the plumber, and the owner pays for the field modifications while the rooms sit offline.
The way to protect the owner is to take control of the millwork engineering before placing an order.
Engineering the Casework in House
As project manager, our approach was to treat the Home2 kitchenette package as a direct manufacturing build from day one.
Instead of accepting standard catalog boxes, we detailed the custom casework shop drawings in-house:
- We pre-engineered the internal utility chases directly inside the cabinet carcasses for the induction cooktops, dishwashers, sinks, and under-cabinet LED feeds.
- We specified high-durability commercial laminate faces engineered to withstand multi-week guest stays, spills, and heavy commercial cleaning agents without delaminating.
- We coordinated the casework dimensions directly with the commercial LVT flooring and acoustic underlayment, ensuring proper sound isolation between multi-night guest suites.
We submitted the complete drawing set and material specifications through the brand portal. When brand architecture and design inspected the package, every finish, measurement, and safety clearance aligned with their prototype standard. The submittal was approved with zero redlines.
Bypassing the Middlemen
With approved submittals in hand, we bypassed domestic catalog distributors entirely.
We sent the approved shop drawings directly to our vetted overseas manufacturing partners. The custom casework was built to the exact room counts, flat-packed into shipping containers, and scheduled on an ocean freight timeline that landed on site the exact week mechanical rough-ins cleared inspection.
By cutting out the domestic catalog markup and manufacturing direct, the owner saved nearly forty percent on the largest line item in the entire PIP. And because the electrical and plumbing chases were engineered into the boxes at the factory, installation was fast and clean, with zero field re-work.
The Takeaway
In extended-stay hospitality, the kitchenette makes or breaks the budget.
If you leave casework to catalog reps, you pay double and inherit their field coordination headaches. When you engineer the shop drawings in-house, secure brand approval, and source directly from the factory floor, you cut out the middlemen and protect the project from start to finish.



