March 30, 2026 · Underwriting
The exit is decided at underwriting
By the time a property is listed, it's too late to fix the plan.
← All Services · 01 · Broker Price Opinions & Commercial BOVs
Ground-truth residential BPOs, commercial BOVs, and land valuations across a 60-mile Houston radius, underwritten by a Texas broker who actually builds.
Fast exterior and interior condition reports, realistic rehab cost verification, and As-Is vs. ARV underwriting for bridge and hard-money lenders.
Defensible date-of-death, probate, and marital asset division valuations without the 4-week wait or $3,000 fee of an MAI appraisal.
Documented market comp and condition evidence packages to contest inflated county Appraisal District assessments.
Cap-rate, NOI, lease-comp, and replacement-cost opinions for retail, small-bay industrial, hospitality, and raw acreage.
Algorithms and automated valuation models miss the reality on the ground. They do not see unpermitted additions, flood-plain splits, localized foundation settlement, or the difference between paper zoning and physical utility. I provide standalone Broker Price Opinions (BPOs) for residential properties and Broker Opinions of Value (BOVs) for commercial assets and raw land across Greater Houston and surrounding counties, from downtown out 60 miles to Wharton, Waller, Hempstead, The Woodlands, Conroe, Montgomery, Galveston, and Baytown.
Every valuation includes verified comparable sales, County Appraisal District (CAD) record reconciliation, and (for field assignments) time-stamped exterior and interior photography.
Most brokers guessing at commercial value or rehab budgets have never bought stone, poured concrete, or carried a construction loan. Because I operate an active construction, materials importing, and land development business alongside a Texas real estate broker license, my repair adjustments and replacement-cost numbers come from lived invoices, not software averages.
Baseline starting fees. Final scope is quoted upfront as a flat fee based on square footage, unit count, or tract complexity before work begins.
Includes: Time-stamped exterior and street-scene photos, 3 active and 3 sold MLS/CAD comparable adjustments, neighborhood trend check, and signed As-Is / 30-Day Quick-Sale value opinion.
Includes: Full interior/exterior photo log, room-by-room condition grading, line-item repair cost estimate using real contractor numbers, and As-Is vs. After-Repair Value (ARV) comp grid.
Includes: On-site property inspection, County Appraisal District (CAD) record audit, market rent and NNN lease comp analysis, stabilized NOI cap-rate model, and replacement-cost check. (Pairs with Commercial Property Sale Listing →)
Includes: Floodplain/topography overlay review, utility corridor and road-frontage check, highest-and-best-use analysis, and adjusted price-per-acre / price-per-sq-ft land sales comps.
Includes: On-site physical plant walk, multi-tenant rent roll or hospitality STR/RevPAR performance audit, deferred maintenance / PIP deduction estimate, and income + sales-comparison valuation. (Pairs with Hospitality & Large-Asset Due Diligence →)
Includes: Direct upload to lender or asset-manager portal format, strict SLA turnaround compliance, and custom photo/comp addenda.
Every capability in this operation is modular. If you only need one specific piece (for example, just custom shop drawings, a single site-walk draw check, or a valuation paired with a contractor bid audit), you do not have to buy a full package. Tell me which pieces you need and I will quote a flat fee for just that scope.
Track record & case studies
Real audits, takeoffs, and field notes from this discipline. View all in Underwriting →
March 30, 2026 · Underwriting
By the time a property is listed, it's too late to fix the plan.
August 14, 2018 · Underwriting
Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.
August 14, 2018 · Underwriting
Walking Denton Creek Inn floor by floor in North DFW to verify all 79 keys, six room layouts, and 38,455 gross square feet against structural prints before pricing the deal.
01 · Property Valuations & BPOs
Start with who you are, the property address, and which scope tier or à la carte deliverable you need. Once you confirm your email, your request delivers directly to Boris.