August 14, 2018  ·  1 min read  ·  Underwriting

Sleep Inn 70-Key Guestroom FF&E Renovation Package: North DFW

Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.

Sleep Inn 70-Key Guestroom FF&E Renovation Package: North DFW

Full-property renovations inside an operating DFW select-service corridor live or die on SKU discipline. Across a 70-key Sleep Inn guestroom renovation package in North DFW backed by brand item specifications and shop drawings for shower pans and surrounds, we mapped every furniture item across four room templates: 30 standard Kings, 6 left-hand King Suites, 28 Double Queens, and 6 Double-Queen Suites.

Even on a straightforward 70-room count, small accessibility adjustments split core quantities into multiple factory runs that owners often overlook in rough budget spreadsheets:

  • Headboards and nightstands: 36 King headboards and 62 Queen headboards paired across 72 King nightstands and 34 Queen nightstand placements to account for shared center tables versus perimeter spacing.
  • Casegoods and wet-area bases: 70 side tables, 70 combo micro-fridge cabinets, 70 luggage benches, and 58 left/right grommet desks, alongside 64 standard closets plus 6 accessible closets and 64 standard vanity bases plus 6 accessible vanity bases.
  • Upholstered seating: 64 accent lounge chairs tracked side-by-side with exact upholstery yardage allowances so fabric mills and wood factories stayed synchronized to one delivery window.

Locking those 64 standard versus 6 accessible splits early on one master renovation matrix ensures an entire 70-room package ships complete in a single coordinated staging sequence rather than stranding six accessible rooms waiting on backfill components.

More Sleep Inn projects

View all 7 Sleep Inn projects →