September 25, 2017  ·  1 min read  ·  Materials

Sleep Inn 82-Key Designed to Dream Casegoods Production Order: Richmond County, GA

Locking down bay-specific wood casegoods production across 82 guestrooms and eight Choice Sleep Inn room configurations in Richmond County, Georgia.

Sleep Inn 82-Key Designed to Dream Casegoods Production Order: Richmond County, GA

Casegoods production runs into field modification headaches whenever handed left and right room wings swap micro-fridge cabinet openings or headboard widths. On a September 2017 Sleep Inn renovation in Richmond County, Georgia, custom wood casegoods quantities were reconciled across eight room configurations under a focused under-$100,000 production order.

Precision Count Across Eight Bay Variations

Each left-hand, right-hand, accessible, and suite layout was counted before locking factory shop tickets across 82 guestrooms:

  • Headboards and nightstands: Scheduled 41 wide 78-inch King headboards, 82 48-inch Queen headboards, 82 20-inch King nightstands, and 41 24-inch Queen nightstands so outlets aligned cleanly on both room hands.
  • Millwork and storage units: Ordered 79 handed left/right micro-fridge cabinets measuring 48 by 24 by 32 inches, 3 three-drawer TV dressers, 82 48-inch desk units, 82 78-inch-tall wardrobes, and 3 matching end, cocktail, and media board sets for suite bays.

Factory Release Without Overbuying

Finalizing handed millwork splits alongside an allowance for freight prevented jobsite carpentry modifications once wood packages arrived in Richmond County.

More Sleep Inn projects

View all 7 Sleep Inn projects →