March 30, 2026 · Underwriting
The exit is decided at underwriting
By the time a property is listed, it's too late to fix the plan.
← All Services · 02 · Pre-Acquisition Due Diligence
Pre-acquisition underwriting, rehab and construction budget reality checks, and entitlement due diligence before you wire earnest money.
Independent audit of a seller's pro-forma, rent assumptions, and hidden deferred maintenance before your option period expires.
Verifying water/sewer capacity, MUD annexation, drainage requirements, and TxDOT or county curb-cut feasibility.
Line-item review of contractor bids and cap-ex budgets using real direct-import material and local trade pricing.
Stress-testing the exit cap rate, refinance debt-service coverage, or terminal resale value at acquisition.
Feasibility is supposed to say no when the numbers lie. Whether you are an out-of-state investor looking at a Houston-area parcel, a syndicator under contract on a value-add commercial building, or an owner-occupant buying raw land in Montgomery, Waller, or Fort Bend County, I run the physical and financial due diligence during your option period.
I walk the site, pull the municipal or county engineering records, check floodway and detention ratios, review existing contractor estimates, and hand you an unvarnished underwriting memo detailing where the risks sit.
Traditional brokers only get paid when a transaction closes, giving them a built-in incentive to gloss over entitlement delays, soil stabilization costs, and optimistic lease-up timelines. On a standalone feasibility engagement, my only job is to protect your capital and tell you what the dirt and the building will actually cost to execute.
Baseline starting fees. Final scope is quoted upfront as a flat fee based on square footage, unit count, or tract complexity before work begins.
Includes: Line-item stress test of seller T-12 / rent roll, reality check on operating expenses and property tax reassessment, review of existing contractor bids, and written risk summary. (No site travel.)
Includes: On-site inspection of roof, envelope, MEP systems, and parking/paving; independent cap-ex and deferred maintenance budget; and a go / no-go acquisition underwriting memo.
Includes: On-site walk of structural shell and MEP capacity, municipal occupancy-change trigger check (fire suppression, grease traps, ADA, parking ratios), and preliminary conversion budget using real trade numbers. (Pairs with Turnkey Commercial Build-Out & Build-to-Suit Execution →)
Includes: Site walk, municipal/MUD water and wastewater capacity check, preliminary detention and floodplain ratio review, TxDOT/county curb-cut check, and net buildable pad yield estimate. (Pairs with Land Entitlement & Civil Management →)
Includes: Multi-room and back-of-house physical inspection, brand PIP line-item cost modeling at direct-import vs. retail rates, historical P&L / STR stress test, and exit cap-rate underwriting. (Pairs with Large Asset & Hospitality BOV →)
Every capability in this operation is modular. If you only need one specific piece (for example, just custom shop drawings, a single site-walk draw check, or a valuation paired with a contractor bid audit), you do not have to buy a full package. Tell me which pieces you need and I will quote a flat fee for just that scope.
Track record & case studies
Real audits, takeoffs, and field notes from this discipline. View all in Underwriting →
March 30, 2026 · Underwriting
By the time a property is listed, it's too late to fix the plan.
August 14, 2018 · Underwriting
Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.
August 14, 2018 · Underwriting
Walking Denton Creek Inn floor by floor in North DFW to verify all 79 keys, six room layouts, and 38,455 gross square feet against structural prints before pricing the deal.
02 · Site Feasibility & Due Diligence
Start with who you are, the property address, and which scope tier or à la carte deliverable you need. Once you confirm your email, your request delivers directly to Boris.