← All Services  ·  04 · Construction & Development Advisory

Owner’s Rep & Build-to-Suit

Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.

Blueprint Takeoffs & Estimating

Division-by-division quantity takeoffs from architectural plans, realistic trade labor pricing, and line-item material schedules.

GC Bid-Leveling & Audit

Comparing third-party contractor proposals against real plan quantities to catch inflated markup and padded allowances.

Owner’s Representation

Direct oversight of third-party GCs, draw-request verification, change-order policing, and schedule enforcement.

Build-to-Suit Advisory

End-to-end execution for commercial tenants and operators needing custom footprints without tying up balance-sheet capital.

Hospitality PIP & Commercial Rehab

Hands-on management of hotel Property Improvement Plans, retail buildouts, and adaptive reuse conversions.

Direct Material Integration

Eliminating middleman markups on stone, tile, quartz, cabinets, and finishes through direct supply-chain sourcing.

What this covers

You do not need to learn construction the hard way on your own balance sheet. Before groundbreaking, I run blueprint quantity takeoffs and trade-by-trade cost estimates so you know what the building will actually cost before committing capital. When contractor bids come in, I level the bids against real plan quantities to eliminate padded allowances and inflated markups.

During construction, someone has to sit on your side of the table who speaks the contractor's language, verifies work in place before draws are wired, and keeps the job paperwork airtight. I step in as your standalone Owner’s Representative managing the GC, as a back-office Construction Contract, AIA Draw & Lien-Waiver Administrator for owners and builders, or as a turnkey Build-to-Suit advisor handling site acquisition through delivery.

Why hire an operator

I have built and renovated assets from the ground up (including commercial properties, residential specs, and hotel/motel operations), and I run a direct material supply operation. I know what labor takes, what materials actually cost at the port, and where schedules slip before they show up on a monthly report.

Turnaround & pricing

Baseline starting fees. Final scope is quoted upfront as a flat fee based on square footage, unit count, or tract complexity before work begins.

GC Bid-Leveling & Allowance Desk Audit Comparing third-party contractor proposals against your plans to catch padded markup and missing scope (3 to 4 business days)

Includes: Side-by-side leveling of up to 3 GC bids, division quantity verification against your PDF drawings, identification of buried exclusions or lowball allowances, and negotiation redlines. (No site travel.)

Starting at $1,250
Blueprint Takeoff & Construction Estimate Independent division-by-division quantity takeoff and realistic cost model from architectural plans (5 to 7 business days)

Includes: Measured material and trade quantities from your PDF plan set, line-item labor and material pricing using lived Texas trade and direct-import numbers, and an itemized construction budget sheet. (Pairs with Material Schedule & Direct-Import Desk Audit →)

Starting at $1,500
On-Site Draw & Change-Order Spot Audit Single field inspection and work-in-place verification for out-of-town owners or private lenders

Includes: On-site walkthrough, time-stamped progress photo log, verification of stored materials and completion percentages against the GC's AIA draw request, and review of pending change orders.

Starting at $650 / visit
Construction Paperwork, AIA Draw & Lien-Waiver Admin Complete back-office construction contract, Schedule of Values, and lender draw administration for owners, investors, and builders

Includes: Setup and administration of subcontractor agreements, COI and W-9 compliance tracking, AIA G702/G703 Schedule of Values (SOV), monthly lender draw packages, change-order logs, and statutory Texas Property Code Ch. 53 conditional and unconditional lien waivers.

Starting at $1,500
Stalled Project & Mid-Build Takeover Audit Field and financial audit when replacing a general contractor or stepping into an unfinished build (4 to 6 business days)

Includes: On-site walk of unfinished work, reconciliation of work-in-place against billed AIA draws, review of open permits and subcontractor lien exposure, and a realistic cost-to-complete recovery and contractor replacement plan.

Starting at $3,500
Owner’s Representation Retainer Ongoing construction oversight sitting in the owner's chair above your general contractor

Includes: Weekly on-site inspections, schedule enforcement, monthly bank draw sign-offs, change-order policing, RFIs/submittal review, and direct integration of wholesale finishes where needed.

Starting at $4,500 / mo
Franchise Hotel PIP Renovation Management Phased on-site renovation execution for franchise hotel Property Improvement Plans (Hilton, Marriott, IHG, Choice, Wyndham) from container arrival through brand sign-off

Includes: Phased floor-by-floor room outage scheduling so the hotel stays open and generating revenue, deploying and managing installation crews for stone vanities, tile, cabinetry, and FF&E, coordinating MEP and ADA upgrades, and walking the franchise brand inspector through final punchlist. (Pairs with our $15,000 PIP CAD, Shop Drawing & Submittal package →)

Cost + % Fee ($25k Min.)
Turnkey Commercial Build-Out & Build-to-Suit Execution End-to-end construction leadership for commercial tenant build-outs, fuel stations, retail centers, restaurants, warehouses, and ground-up developments

Includes: Writing the construction scope, teaming up with a partnered commercial General Contractor from our network for daily on-site supervision (or deploying our vetted trade crews directly on interior build-outs), bidding and contracting subcontractors, supplying stone/tile/millwork at wholesale, controlling AIA bank draws, and managing city inspections through Certificate of Occupancy. (Pairs with Commercial Buyer & Tenant Representation →)

Cost + % Fee ($35k Min.)

Need à la carte or a combined scope?

Every capability in this operation is modular. If you only need one specific piece (for example, just custom shop drawings, a single site-walk draw check, or a valuation paired with a contractor bid audit), you do not have to buy a full package. Tell me which pieces you need and I will quote a flat fee for just that scope.

Track record & case studies

Recent Construction entries

Real audits, takeoffs, and field notes from this discipline. View all in Construction →

04 · Owner’s Rep & Build-to-Suit

Ready to scope this for your property or project?

Start with who you are, the property address, and which scope tier or à la carte deliverable you need. Once you confirm your email, your request delivers directly to Boris.