May 14, 2010 · Underwriting
Underwriting physical plant conditions, exterior breezeways, and capital expenditure reserves for a multi-family residential apartment community along a San Antonio transit corridor.
April 12, 2010 · Underwriting
Underwriting forecourt fuel infrastructure, commercial refrigeration walk-in vaults, and environmental compliance for a commercial convenience store and fuel station along the Texas Gulf Coast.
April 12, 2010 · Systems
Engineering high-capacity commercial water heating, sub-slab lint traps, and high-flow plumbing infrastructure for a dual laundromat and car wash facility.
April 6, 2010 · Construction
Sequencing an under-$100,000 roof deck tear-off, canopy rebuild, ceiling sheetrock repair, and full interior repaint on a commercial warehouse in Inner-Loop East Houston.
February 22, 2010 · Construction
Developing a high-volume interstate travel plaza, engineering underground fuel storage tanks, high-flow diesel master-satellite islands, and commercial retail operations.
January 4, 2010 · Construction
Delivering multi-tenant retail infill at Ashford Lakes Shopping Center, anchored by the Little Kiddos Daycare build-out alongside insurance and personal service suites with strict life-safety egress and lien control.
November 19, 2009 · Underwriting
Evaluating physical plant conditions, structural exterior corridor concrete walkways, commercial swimming pool filtration systems, and central MEP plant infrastructure for the 150-room Florida Suites property along the Central Florida tourism corridor.
November 17, 2009 · Construction
Adding a high-energy sports bar to Post Oak Grill demands insulated glycol draft runs, acoustic isolation between dining zones, structural AV rigging, and custom commercial bar millwork built to take heavy nightly volume.
November 11, 2009 · Underwriting
Underwriting a 2,400 sq ft leased Shamrock convenience store and fueling operation in Austin where triple-net occupancy costs and a fresh jobber contract set the deal economics.
October 6, 2009 · Underwriting
Coordinating lender pre-approval conditions, 20-day title commitments, and TREC financing contingency deadlines on a Houston brokerage transaction.
September 30, 2009 · Construction
Executing a multi-phase brand conversion and PIP audit to transition an independent hotel into a Ramada franchise, managing exterior facade and public space overhauls.
September 15, 2009 · Construction
Managing the specialized MEP build-out and architectural space planning for Bio Skin & Laser, a commercial medical aesthetic clinic and laser facility in Greater Houston Area, TX.
August 25, 2009 · Underwriting
Engineering commercial petroleum travel plaza civil site plans, underground storage tank setbacks, commercial multi-pump fueling canopy geometry, stormwater retention basins, and heavy vehicle turning radiuses along a Texas transit corridor.
August 21, 2009 · Materials
Managing a State Farm insurance office tenant build-out, commercial drywall assembly delivery, structural metal stud framing, and acoustic partition construction in the West Houston corridor.
August 10, 2009 · Underwriting
Underwriting an operating Passport Inn & Suites along a Central Texas highway corridor by auditing county property tax appraisals, utility ratios, and physical plant condition.
August 6, 2009 · Systems
Running a 30-milestone transfer system to take over an operating Lenny's Sub Shop franchise in Greater Houston without dropping payroll, food distribution, or merchant processing.
July 27, 2009 · Land
Carving a 1.1024-acre hotel development pad out of a 9.504-acre commercial tract in the West Houston corridor with a dedicated 60-foot public street, shared detention reserve, and layered utility easements.
July 22, 2009 · Underwriting
Auditing neighborhood commercial grocery facilities, inline restaurant dining spaces, standing seam metal awning canopies, and asphalt parking infrastructure in the Lake Houston corridor.
July 2, 2009 · Construction
Directing commercial restaurant architectural space planning, Type I commercial kitchen exhaust hood ventilation, grease waste drainage infrastructure, three-compartment pot wash sinks, and municipal health code compliance in Houston.
June 23, 2009 · Construction
Documenting architectural as-built spatial layouts, structural perimeter wall dimensions, ADA restroom compliance, commercial electrical switchgear capacity, and tenant lease demising for a retail store build-out in the Southwest Houston corridor.
June 18, 2009 · Construction
Directing heavy industrial concrete pavement diagnostics, masonry load-bearing envelope restoration, structural steel column repairs, and unit-cost capital audits for an industrial distribution facility in urban Houston.
June 6, 2009 · Materials
Directing Mobil commercial interstate travel plaza fueling canopy inspections, high-volume diesel dispenser island upgrades, heavy-duty concrete pavement reconstruction, and subgrade stabilization along the East Texas Interstate 10 corridor.
June 6, 2009 · Construction
Managing post-hurricane structural reconstruction, insurance scope reconciliation, fuel canopy re-commissioning, and C-store fit-out for a Mobil travel plaza on the Gulf Coast.
May 18, 2009 · Construction
Directing ground-up commercial construction of a Valero fueling station and multi-tenant retail center, managing structural steel canopies, 32,000 square feet of heavy concrete paving, underground utilities, and storefront delivery in Northeast Houston.