September 10, 2008 · Underwriting
Walking the roof, auditing rooftop package chillers, electrical switchboards, and life safety systems for an operating Ramada hotel along the North Houston highway corridor.
August 28, 2008 · Underwriting
Executing pre-auction physical plant due diligence, county tax parcel verification, and Quality Inn PIP underwriting for a multi-building freeway hotel in Greater DFW.
August 20, 2008 · Construction
Quantifying exterior masonry elevations, fenestration assemblies, and natatorium enclosure retrofits for OakHill Hotel in San Antonio.
August 20, 2008 · Underwriting
Auditing physical plant systems, building envelopes, and franchise conversion feasibility for a Super 8 hotel along the Northwest Houston highway corridor.
August 20, 2008 · Underwriting
Underwriting a 56-key La Quinta Inn & Suites along a North Texas freight corridor by auditing commercial room demand, housekeeping cost per key, and cap rate sensitivity.
August 18, 2008 · Construction
Conducting post-hurricane forensic building envelope audits, exterior insulation finish system repairs, commercial roof membrane moisture scans, and interior guestroom remediation for a Quality Inn hotel along the Texas Gulf Coast corridor.
August 15, 2008 · Underwriting
Cross-checking state Comptroller hotel tax filings against internal P&L ledgers and pricing a targeted repositioning PIP for a Ramada along the North Houston transit corridor.
August 14, 2008 · Underwriting
Underwriting the Chapter 11 bankruptcy acquisition of the 1.2 million square foot Sharpstown Mall, auditing tenant CAM pools, and unbundling reciprocal easement agreements.
August 13, 2008 · Construction
Directing multi-story commercial hospitality architectural elevation planning, structural cast-in-place concrete frame design, exterior facade detailing, and centralized MEP plant integration for a four-story Four Points by Sheraton hotel prototype.
August 12, 2008 · Underwriting
Valuing an urban core Super 8 property by underwriting in-place economy lodging cash flow alongside long-term high-density land redevelopment optionality.
July 31, 2008 · Underwriting
Managing acquisition due diligence, settlement statement prorations, and Wyndham PIP transition planning for an operating Days Inn in Central Texas.
July 23, 2008 · Underwriting
Underwriting physical plant conditions, central domestic boilers, and property tax valuation forensics for the 180-unit Whispering Oaks Apartments community in Southwest Houston.
July 18, 2008 · Materials
Coordinating extended-stay commercial lodging prototype architecture, in-room kitchenette plumbing and dedicated electrical branch circuits, guest laundry facilities, and brand development economics in the Northeast Houston corridor.
July 18, 2008 · Materials
Directing architectural prototype spatial planning, 80-room select-economy lodging building envelope design, high-efficiency guestroom pod layouts, and franchise capital budgeting in Northeast Houston.
July 17, 2008 · Underwriting
Underwriting industrial corridor commercial lodging feasibility, 108-room prototype spatial design, civil detention pond engineering, and heavy transit circulation for a Motel 6 development in the East Houston industrial corridor.
July 16, 2008 · Underwriting
Auditing multi-tenant commercial retail leases, restaurant grease trap MEP systems, and parking infrastructure for Plaza Del Rey Shopping Center in the Southwest Houston corridor.
July 16, 2008 · Materials
Directing commercial suburban lodging prototype architecture, 92-room structural framing design, civil stormwater retention, and franchise development budgeting in the Northwest Houston corridor.
July 14, 2008 · Construction
Running pre-development civil plat audits, highway deceleration sightline checks, and real construction feasibility underwriting for a ground-up Fairfield Inn & Suites in Northwest Houston.
June 30, 2008 · Construction
Managing the boundary easement audit, exterior envelope remediation, and Wyndham PIP scope to convert an operating Days Inn into a Super 8 in the Greater Houston Area.
June 20, 2008 · Underwriting
Buying an operating fuel station and C-store means underwriting two separate businesses under one roof: underground tank compliance and jobber rack spreads outside, paired with high-margin cooler and merchandise velocity inside.
June 19, 2008 · Underwriting
Broker offering memorandums project aggressive occupancy growth and minimal capex. Building a real five-year hotel pro forma means auditing STAR competitive penetration and pricing the actual PIP line by line.
June 17, 2008 · Underwriting
Auditing post-opening P&L stabilization, housekeeping labor ratios, and franchise fee structures for a 71-key La Quinta Inn & Suites along a Northeast Texas highway corridor.
June 12, 2008 · Underwriting
Auditing high-bay clear heights, structural slab floor load capacities, and commercial loading dock logistics for a hospitality furniture distribution facility in the Southwest Houston corridor.
June 12, 2008 · Underwriting
Structuring and underwriting a single-tenant absolute NNN sale-leaseback for a high-volume Valero fueling facility along the Texas Gulf Coast.