February 28, 2018 · Underwriting
How digital floorplan takeoffs across nine guestroom subtypes and direct factory terms structured a seven-figure FF&E budget with 50-to-60-day ocean transit discipline.
June 16, 2015 · Underwriting
A 90-page preliminary four-story architectural, site, structural, and MEP plan set issued specifically for early construction budget estimating in West Houston TX.
August 25, 2014 · Underwriting
Breaking down a low-six-figure partial FF&E renovation budget across ten guestroom configurations and three iterative AutoCAD lobby layouts.
July 16, 2013 · Underwriting
Physical plant, capital expenditure, and flag-conversion due diligence on a 238-key 11-story full-service Holiday Inn near Texas Medical Center in Houston.
July 1, 2011 · Underwriting
Structuring a 60-month single-tenant retail fuel station lease in Northwest Houston alongside a 10-year exclusive jobber fuel supply agreement, imaging clawbacks, and merchant processing terms.
June 20, 2011 · Underwriting
Conducting structural engineering assessments, heavy power audits, and robotic cell utility due diligence for an industrial precision machine shop facility in Houston.
May 24, 2011 · Underwriting
Conducting structural engineering assessments, clear-span steel frame audits, and heavy power evaluations for an industrial distribution warehouse in Houston.
May 15, 2011 · Underwriting
Underwriting physical plant conditions, grocery anchor mechanical capacity, and retail bay space planning for a multi-tenant shopping center along the West Houston corridor.
September 28, 2010 · Underwriting
Conducting comprehensive commercial acquisition due diligence on an operating Chevron retail fueling station and convenience store, evaluating multi-pump fueling canopies, environmental underground storage tank compliance, and forecourt civil paving in Inner Loop Houston.
August 16, 2010 · Underwriting
Underwriting physical plant conditions, Choice Hotels PIP requirements, and historical STR RevPAR performance for a Comfort Inn along the US-290 corridor in Northwest Houston.
June 25, 2010 · Underwriting
Conducting commercial land feasibility, TxDOT highway access analysis, and utility district capacity underwriting for master-planned commercial reserves along the US-59 North Houston corridor.
October 6, 2009 · Underwriting
Coordinating lender pre-approval conditions, 20-day title commitments, and TREC financing contingency deadlines on a Houston brokerage transaction.
July 22, 2009 · Underwriting
Auditing neighborhood commercial grocery facilities, inline restaurant dining spaces, standing seam metal awning canopies, and asphalt parking infrastructure in the Lake Houston corridor.
December 15, 2008 · Underwriting
Master planning an interstate commercial travel plaza, high-volume fuel canopy, and IMST market feasibility analysis along the North Houston highway corridor.
November 20, 2008 · Underwriting
Reconciling boundary surveys, TxDOT highway right-of-way easements, and underground tank setbacks for an operating Mobil station along a Houston highway corridor.
October 28, 2008 · Underwriting
Underwriting a combined Shell fuel station, convenience store, and multi-tenant retail strip in Southeast Houston by auditing gallonage margins, cooler sales, and NNN tenant leases.
October 8, 2008 · Underwriting
Conducting post-hurricane building envelope forensics, roof membrane assessments, and guestroom PTAC physical plant audits for Travelers Inn along the North Houston highway corridor.
September 18, 2008 · Underwriting
Airport corridor hotels run on volatile transit, airline crew, and distressed-passenger demand. Turning around an underperforming property requires daily flash tracking, strict brand QA punchlists, and direct contract room allocations.
September 18, 2008 · Underwriting
Walking the physical plant, auditing building envelopes, and underwriting franchise conversion capital reserves for an airport corridor hotel near Houston Hobby Airport.
September 15, 2008 · Underwriting
Underwriting a combined Texaco fuel station and multi-bay automotive repair center in West Houston, auditing hydraulic lifts, oil-water separators, and fuel equipment.
September 14, 2008 · Underwriting
Auditing canopy structure, dispenser equipment life, C-store merchandise velocity, and inline strip-center leases for a Texaco retail plaza in Houston.
September 10, 2008 · Underwriting
Walking the roof, auditing rooftop package chillers, electrical switchboards, and life safety systems for an operating Ramada hotel along the North Houston highway corridor.
August 20, 2008 · Underwriting
Auditing physical plant systems, building envelopes, and franchise conversion feasibility for a Super 8 hotel along the Northwest Houston highway corridor.
August 15, 2008 · Underwriting
Cross-checking state Comptroller hotel tax filings against internal P&L ledgers and pricing a targeted repositioning PIP for a Ramada along the North Houston transit corridor.