Urban Corner C-Store & Forecourt Diligence in Inner-Loop Houston
Recording dual-canopy fueling geometry, brick retail envelopes, and corner curb access across 48 high-res field photos in Inner-Loop Houston.
Houston is home, and most of the work is here: hotels, fuel stations, retail centers, land and housing on every side of the city. These notes are those projects, one at a time.
September 28, 2010 · Land
Recording dual-canopy fueling geometry, brick retail envelopes, and corner curb access across 48 high-res field photos in Inner-Loop Houston.
June 15, 2010 · Land
Assembling contiguous urban parcels, navigating deed restrictions, and underwriting high-density residential redevelopment for the McCue Apartments site in the Galleria area.
July 27, 2009 · Land
Carving a 1.1024-acre hotel development pad out of a 9.504-acre commercial tract in the West Houston corridor with a dedicated 60-foot public street, shared detention reserve, and layered utility easements.
November 20, 2008 · Land
Designing the civil site concept and parking master plan for a 52-key Budgetel Inn & Suites along the US-59 Northeast Houston corridor, optimizing drive aisles, fire lanes, and drainage swales.
April 28, 2008 · Land
Evaluating commercial hotel land acquisition, stormwater mitigation easements, and Harris County Flood Control District drainage criteria in the West Houston Energy Corridor.
March 20, 2008 · Land
Auditing flood plain boundaries, drainage easements, and municipal utility district capacity for greenfield commercial acreage along an expanding corridor.
October 25, 2007 · Land
Master planning site civil entitlements, geotechnical soil mitigation, and municipal utility district capacity for AnderHawk Village Apartments, a ground-up student housing community.
September 11, 2006 · Land
Engineering the 1.999-acre ground-up Northstar Kids Academy campus in Northwest Houston with a 15,080-square-foot slab, 47-by-100-foot detention basin, and county fire-access compliance.