September 12, 2018 · Materials
Directing brand-mandated Holiday Inn Express Formula Blue guestroom FF&E procurement, custom hospitality casegoods detailing, and architectural space audits in West Texas.
September 10, 2018 · Materials
Converting a 91-key economy motel to Choice Quality Inn standards with coordinated seating, ADA wet-area kits, lighting, and flooring takeoffs in San Antonio, Texas.
August 30, 2018 · Lessons
How unverified rough-in tolerances across a 67-room occupied PIP forced floor-by-floor quartz field cuts, backsplash modifications, and valve change orders.
August 21, 2018 · Materials
Sizing 104 extended-stay kitchenettes, engineered quartz tops, and shower surrounds across seven unit layouts under the Staybridge Suites Flora scheme in North Houston.
August 16, 2018 · Materials
Auditing 154 pages of conversion engineering plans and 178 room schedules to source custom hospitality lighting direct from factory lines in Central Texas.
August 14, 2018 · Underwriting
Breaking down every casegood, closet, seating, and vanity SKU across 30 Kings, 28 Double Queens, and 12 Suites for a complete 70-key North DFW renovation.
August 14, 2018 · Underwriting
Walking Denton Creek Inn floor by floor in North DFW to verify all 79 keys, six room layouts, and 38,455 gross square feet against structural prints before pricing the deal.
July 19, 2018 · Materials
Standardizing 99 tub surrounds, integral quartz vanity aprons, and modular 96-inch trim kits keeps repeat-room hotel bathroom retrofits predictable across a three-figure room block.
July 17, 2018 · Materials
Coordinating an 83-key four-story Holiday Inn Express Formula Blue Contemporary FF&E procurement bid with exterior architectural elevation plans in Dawson County, Georgia.
July 11, 2018 · Construction
Coordinating architectural permit drawings, 81-key Formula Blue FF&E schedules, and custom breakfast millwork on a new-build Holiday Inn Express in West Texas.
June 12, 2018 · Materials
Aligning field meeting revisions, non-upholstered casegoods, and 70 guestroom bathroom packages on a Choice Quality Inn renovation in Greater DFW, Texas.
May 15, 2018 · Construction
Mapping the 35-key Danbury Hotel extended-stay conversion across four architectural floor levels with custom quartz kitchenettes, suite casegoods, and lighting in Western Connecticut.
April 25, 2018 · Systems
Managing a 156-room coastal hotel public space conversion using a 276-page specification book, Revit first-floor models, and multi-stage PO tracking.
April 17, 2018 · Materials
Coordinating guestroom casegoods, bedding, seating, and lighting quantities for a 57-key La Quinta Living Modern 2.0 Del Sol renovation on the Texas Gulf Coast.
April 17, 2018 · Materials
Separating guestroom labor, materials, and open-concept lobby remodeling for a 67-key La Quinta Del Sol Property Improvement Plan in Harris County, Texas.
April 17, 2018 · Materials
Modern Truly Yours renovation budget and multi-vendor PO procurement schedule for a 61-key Comfort Inn property in Central Florida.
April 12, 2018 · Materials
Building the brand-approved interior design submittal board and sourcing commercial lobby seating, breakfast millwork, and high-wear finishes direct for a Baymont Inn & Suites in Central Texas.
April 2, 2018 · Underwriting
How pre-built building-material and FF&E templates turned 2018 AAHOA convention floor leads into complete architectural takeoffs across North DFW and Central Texas hotels.
March 18, 2018 · Construction
Reviewing preliminary four-story exterior EIFS elevation assemblies alongside an 11-sheet Tru by Hilton guestroom interior package in Greene County, Georgia.
March 9, 2018 · Materials
Directing the architectural millwork, acoustic engineering, and material specifications for the Gujarati Samaj Houston Event Center and multi-story grand ballroom.
March 8, 2018 · Systems
Synchronizing a 20-sheet architectural and MEP plan set with iterative FF&E design boards before locking specifications on an Oklahoma hospitality project.
February 28, 2018 · Underwriting
How digital floorplan takeoffs across nine guestroom subtypes and direct factory terms structured a seven-figure FF&E budget with 50-to-60-day ocean transit discipline.
February 26, 2018 · Materials
Synchronizing 54 pre-cut White Quartz countertop sets, stainless and porcelain sinks, and knocked-down birch shaker cabinetry with architectural blueprints for a Central Texas residential build.
February 14, 2018 · Construction
Directing emergency building envelope drying, structural moisture mapping, and insurance scope reconciliation for an Americas Best Value Inn on the Texas Gulf Coast following Hurricane Harvey.