February 13, 2018 · Construction
Synchronizing a 182-page brand design manual, 56 pages of architectural plans, and gated milestone production draws across a 145-room coastal property.
February 2, 2018 · Construction
Walking a 58-room Formula Blue PIP renovation through lender construction cost breakdowns, 80-page brand submittals, and wet-wall shower staging.
January 26, 2018 · Materials
Directing architectural prototype spatial planning, structural steel porte-cochere canopy engineering, exterior composite facade cladding specifications, and commercial FF&E procurement strategies for national hospitality brand standards.
January 18, 2018 · Underwriting
Cataloging 35 damaged coastal guestrooms room by room at Americas Best Value Inn in the Texas Coastal Bend across nine unit layouts to support windstorm claim replacement.
January 12, 2018 · Materials
Resolving wood grains, vinyl wallcoverings, quartz tops, and outlet heights across five elevation sheets (A210-A250) and nine 3D renders before West Texas factory production.
January 11, 2018 · Construction
Tying three-story architectural floor plans, outdoor pool site details, and a 77-key guestroom FF&E buyout together for a San Antonio La Quinta build.
January 11, 2018 · Land
Aligning a 41-page geotech soil report, 156-page architecture specs, A101-A104 floorplates, and coastal framing plans across a 77-key Texas Gulf Coast build.
January 10, 2018 · Materials
Coordinating floor-by-floor replacement counts, bedding, casegoods, and appliance buyouts for a 59-key Red Roof Inn renovation along the Texas Gulf Coast.
December 23, 2017 · Lessons
Walking a hurricane-damaged three-story Holiday Inn Express on the Texas Coastal Bend to separate stripped wet-wall framing and corroded steel bases from salvageable room inventory.
December 20, 2017 · Lessons
Establishing clean disposition rules at a storm-hit Country Inn & Suites on the Texas Coastal Bend to save solid seating while replacing water-wicked perimeter millwork.
December 20, 2017 · Systems
How mapping 449 DSLR inspection photos directly onto a live 91-room, 4-floor housekeeping status report kept storm-recovery procurement moving inside an operating hotel.
December 20, 2017 · Systems
How a floor-by-floor La Quinta room audit separated moisture-damaged furniture from intact rooms after coastal storm water intrusion on the Texas Gulf Coast.
December 20, 2017 · Systems
Pairing 67 post-storm suite photos with a 29-page fixture order guide, 17-page millwork drawings, and a live OOO tracker to accelerate Texas Gulf Coast returns-to-service.
December 4, 2017 · Construction
Aligning a 94-key four-story Fairfield Inn & Suites construction drawing set with Marriott Modern Calm Decor specifications and procurement takeoffs in Cameron County, TX.
November 27, 2017 · Materials
Aligning a 13-page PIP audit, 14-page prototype set, and 80-key extended-stay quartz/sink schedule across a mid-six-figure Texas Medical Center renovation.
November 22, 2017 · Materials
Structuring an 86-key Holiday Inn Express Formula Blue Contemporary FF&E procurement schedule across guestrooms, public spaces, fitness equipment, and pool furniture in Coffee County, Alabama.
November 21, 2017 · Lessons
Documenting 29 guestrooms and 885 tagged inspection photos across the hurricane-damaged Blue Wave Inn on the Texas Coastal Bend to substantiate PTAC, mold, and envelope insurance claims.
November 21, 2017 · Construction
Comparing untouched upper-floor suites side by side against seven full-gut ground rooms inside a North Houston Holiday Inn ahead of renovation pricing.
November 21, 2017 · Underwriting
Auditing chrome chair bases, brushed metal desk collars, and upholstery humidity wear across a waterfront Holiday Inn on the Texas Gulf Coast.
November 12, 2017 · Materials
Consolidating casegoods, seating, bedding, drapery, and lighting quantities into a single turnkey buyout for a 38-key Rodeway Inn in Kleberg County, Texas.
October 12, 2017 · Materials
When a roadside hotel mixes double-queens, kings, and extended-stay suites, generic catalog bundles fail in the field. Measuring each room type individually and ordering casegoods direct from the factory eliminates installation friction.
September 25, 2017 · Materials
Locking down bay-specific wood casegoods production across 82 guestrooms and eight Choice Sleep Inn room configurations in Richmond County, Georgia.
September 18, 2017 · Materials
Aligning a 3-page design board, COM public lounge upholstery, and an 80-key guestroom takeoff inside a mid-six-figure Southwest Louisiana renovation.
September 8, 2017 · Materials
When coastal floodwaters hit an operating hotel, mitigation contractors push to gut entire floors. Enforcing a disciplined four-foot flood cut and separating demo from finish trades gets rooms back online months faster.