August 20, 2017 · Materials
Repositioning an older highway motel under a national economy flag requires a coordinated interior design board, room-by-room takeoff quantities, and container-direct FF&E sourcing to hit brand inspection without overspending.
August 8, 2017 · Systems
Blending two ocean containers of custom LED mirrors, lighting, and casegoods with domestic bedding and wallcoverings across a low-six-figure conversion package.
July 28, 2017 · Materials
How a 62-page coastal renovation plan set, four BIM suite models, and a 153-page FF&E manual align durability specs before saltwater humidity tests the finish schedule.
July 25, 2017 · Land
Scaling Peninsula Apartments across four residential building plans on the South Texas Coast from site utility and 3D unit models into container-level kitchen and bath packages.
June 15, 2017 · Materials
Economy hotel PIPs leave zero margin for forty-percent distributor catalog markups. Deconstructing the franchise spec book and sourcing casegoods, carpet, and lighting direct from manufacturers keeps the renovation on budget.
May 31, 2017 · Construction
Translating archival TIFF floorplans into a coordinated 97-key guestroom and lounge package inside a mid-six-figure North Houston soft-brand conversion.
May 24, 2017 · Construction
Coordinating a 72-sheet construction drawing set, geotechnical engineering, custom finish boards, and a 54-key FF&E schedule for a new Quality Inn in Nashville, Tennessee.
May 15, 2017 · Systems
Translating a brand change-of-ownership Property Improvement Plan across 86 guestrooms, lobby, and meeting space into a structured FF&E bid matrix in Brazoria County.
May 8, 2017 · Construction
Bridging a 140-sheet four-story construction set and a turnkey Formula Blue FF&E and quartz quotation for an 82-room Fort Bend County Holiday Inn Express.
May 4, 2017 · Construction
Integrating ground-up concrete slab utilities and an 85-page architectural plan set with a seven-figure Formula Blue turnkey FF&E takeoff for a 109-key hotel.
April 28, 2017 · Materials
Move-to-Modern FF&E quotation and public-space submittal package for an 82-key Comfort Inn & Suites renovation along the northwest corridor of San Antonio.
April 25, 2017 · Materials
Pairing franchise AES PIP compliance with complete guestroom casegoods, quartz vanities, tub surrounds, and public-space flooring for an 80-key Sleep Inn in the Raleigh metro, North Carolina.
April 3, 2017 · Construction
Coordinating a license renewal Property Improvement Plan, H4 Coral and Amber FF&E specifications, and custom reception and bar millwork for a five-story 106-key Holiday Inn with indoor waterpark in Lucas County, Ohio.
March 29, 2017 · Construction
Coordinating multi-discipline civil, structural, 51-sheet architectural, MEP, food-service, and landscape construction documents for a 135-key Red Lion Suites build in Brazos County, Texas.
March 22, 2017 · Materials
Inside the factory shop drawings, pallet separation foam, and dimensional checks for 89 tub and shower surrounds plus 86 quartz vanity assemblies on an Upper Texas Coast build.
March 16, 2017 · Materials
Managing 15 distinct extended-stay suite floorplans and Gen 9 Possibilities public space finishes across a 110-key Residence Inn by Marriott in Northern Colorado.
March 10, 2017 · Materials
Coordinating a 485-page master spec manual, 73-page architectural plan set, and 212 banquet chairs across Amber and Coral schemes on 107 full-service keys.
March 3, 2017 · Materials
Engineering knockdown HPL vanities (69 units) and 221 fabricated quartz pieces totaling 7.43 metric tons inside a focused under-$100,000 South Texas millwork-and-stone scope.
March 3, 2017 · Construction
Coordinating a 187-page Issued-for-Construction plan set, 15-page fire-code approvals, and a seven-figure FF&E delivery for an 86-room North Houston hotel.
February 15, 2017 · Construction
Complete architectural site plans, 149-page guestroom spec book, and mid-six-figure five-year PIP renovation and FF&E bid for a 66-key Comfort Suites in Iowa.
February 15, 2017 · Systems
Aligning two connected hotel buildings with Comfort Inn & Suites Move to Modern standards across lobby finishes, corridor carpets, wet-bar suites, and exterior envelope work in the Mid-Atlantic.
February 1, 2017 · Materials
Coordinating 76 guestrooms across nine handed Choice 2.0 layouts with quartz countertops, hardware counts, and public area tables in West Houston.
February 1, 2017 · Underwriting
How a 93-room Central Texas new-build split into nine distinct floorplan types, requiring tight alignment between CAD layouts, lounge seating, and bedding pack counts.
January 25, 2017 · Construction
Coordinating a 122-key five-story Holiday Inn ground-up drawing set, structural engineering, and interior finish selections on a 3.63-acre Collin County, Texas site.