Construction

Ground-up commercial builds, hospitality PIP renovations, and structural/MEP execution run from whichever chair fits the project: in-house General Contractor or Owner's Representative managing the GC, budget, and draw schedule.

Precon to Punchlist

How vertical construction runs here

A build is won or lost before the first hammer swings. Whether sitting in the General Contractor chair or acting as Owner's Representative above an outside GC, we lock the assembly quantities, level the subcontractor bids, and tie every draw to verified field completion. See all eight steps of the full operation →

01 · Assembly Takeoffs & Bid Leveling

Breaking architectural plans down to exact material quantities and trade labor lines to expose padding and scope gaps across competing GC bids.

02 · Structural, Concrete & MEP

Coordinating slab-on-grade, structural steel, framing, high-capacity plumbing, grease traps, electrical switchgear, and HVAC rough-ins before walls close.

03 · Field Walks & Draw Control

Verifying physical completion percentages on site, collecting unconditional lien waivers, and blocking front-loaded contractor pay applications.

04 · Franchise PIP & Turnkey Closeout

Executing hospitality renovations and commercial tenant build-outs inside active properties to pass brand punchlists and municipal certificate of occupancy.

Standalone Advisory & Execution

Compare all 6 services & à la carte options →
04 Advisory & Rep

Owner’s Rep & Build-to-Suit

Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.