Owner’s Rep & Build-to-Suit
Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.
← Operation · Discipline Record
Ground-up commercial builds, hospitality PIP renovations, and structural/MEP execution run from whichever chair fits the project: in-house General Contractor or Owner's Representative managing the GC, budget, and draw schedule.
Precon to Punchlist
A build is won or lost before the first hammer swings. Whether sitting in the General Contractor chair or acting as Owner's Representative above an outside GC, we lock the assembly quantities, level the subcontractor bids, and tie every draw to verified field completion. See all eight steps of the full operation →
Breaking architectural plans down to exact material quantities and trade labor lines to expose padding and scope gaps across competing GC bids.
Coordinating slab-on-grade, structural steel, framing, high-capacity plumbing, grease traps, electrical switchgear, and HVAC rough-ins before walls close.
Verifying physical completion percentages on site, collecting unconditional lien waivers, and blocking front-loaded contractor pay applications.
Executing hospitality renovations and commercial tenant build-outs inside active properties to pass brand punchlists and municipal certificate of occupancy.
Standalone Advisory & Execution
Compare all 6 services & à la carte options →Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.
August 22, 2011
Directing commercial adaptive-reuse construction, grand ballroom acoustic engineering, and high-occupancy life safety fit-outs for an event venue in Houston.
April 18, 2011
Directing structural steel frame repairs, industrial masonry envelope restoration, and unit-cost capital expenditure budgeting for an industrial facility in urban Houston.
April 6, 2010
Sequencing an under-$100,000 roof deck tear-off, canopy rebuild, ceiling sheetrock repair, and full interior repaint on a commercial warehouse in Inner-Loop East Houston.
June 18, 2009
Directing heavy industrial concrete pavement diagnostics, masonry load-bearing envelope restoration, structural steel column repairs, and unit-cost capital audits for an industrial distribution facility in urban Houston.
October 15, 2008
Full tear-off and four-ply built-up roof replacement bid for a 44,500-square-foot commercial facility, separating structural deck contingencies from a five-week installation and draw schedule.
August 20, 2007
Converting an industrial warehouse into the AIM Limousine Services fleet maintenance facility, dispatch center, and secure vehicle staging yard.