Owner’s Rep & Build-to-Suit
Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.
← Operation · Discipline Record
Ground-up commercial builds, hospitality PIP renovations, and structural/MEP execution run from whichever chair fits the project: in-house General Contractor or Owner's Representative managing the GC, budget, and draw schedule.
Precon to Punchlist
A build is won or lost before the first hammer swings. Whether sitting in the General Contractor chair or acting as Owner's Representative above an outside GC, we lock the assembly quantities, level the subcontractor bids, and tie every draw to verified field completion. See all eight steps of the full operation →
Breaking architectural plans down to exact material quantities and trade labor lines to expose padding and scope gaps across competing GC bids.
Coordinating slab-on-grade, structural steel, framing, high-capacity plumbing, grease traps, electrical switchgear, and HVAC rough-ins before walls close.
Verifying physical completion percentages on site, collecting unconditional lien waivers, and blocking front-loaded contractor pay applications.
Executing hospitality renovations and commercial tenant build-outs inside active properties to pass brand punchlists and municipal certificate of occupancy.
Standalone Advisory & Execution
Compare all 6 services & à la carte options →Sitting in the owner’s chair above the GC, from plan takeoffs and bid leveling through build-to-suit lease structuring, PIP execution, and final punchlist.
April 15, 2009
Commercial restaurant build-outs pack heavy mechanical, electrical, and sub-slab grease plumbing into tight footprints. Preconstruction air balancing and millwork coordination prevent permit delays at final inspection.
November 18, 2008
Managing the adaptive reuse conversion of a two-story commercial office building into a Quality Inn franchise, coordinating site civil logistics and MEP core modifications.
November 10, 2008
Directing the architectural takeoff, MEP physical plant audit, and unbundled franchise PIP budget for a 138-room two-building hotel conversion in East Texas.
October 24, 2008
Executing heavy civil reconstruction and canopy modernization for a high-traffic retail fueling facility along the Northeast Houston commercial corridor.
October 15, 2008
Full tear-off and four-ply built-up roof replacement bid for a 44,500-square-foot commercial facility, separating structural deck contingencies from a five-week installation and draw schedule.
October 14, 2008
Coastal hotel renovations fail when cosmetic finishes go up over wet sheathing. Stripping storm-damaged envelope sections, replacing the low-slope roof membrane, and separating insurance scopes from PIP capex protects the asset.
September 30, 2008
Auditing a multi-million capital expenditure program for a full-service Hilton tower, unbundling guestroom MEP modernizations, and staging phased atrium public space renovations.
September 22, 2008
Evaluating commercial medical clinic tenant improvements, City of Houston life safety compliance, and dedicated electrical laser circuits for Maven Med Spa in the Greater Houston area.
August 20, 2008
Quantifying exterior masonry elevations, fenestration assemblies, and natatorium enclosure retrofits for OakHill Hotel in San Antonio.
August 18, 2008
Conducting post-hurricane forensic building envelope audits, exterior insulation finish system repairs, commercial roof membrane moisture scans, and interior guestroom remediation for a Quality Inn hotel along the Texas Gulf Coast corridor.
August 13, 2008
Directing multi-story commercial hospitality architectural elevation planning, structural cast-in-place concrete frame design, exterior facade detailing, and centralized MEP plant integration for a four-story Four Points by Sheraton hotel prototype.
July 14, 2008
Running pre-development civil plat audits, highway deceleration sightline checks, and real construction feasibility underwriting for a ground-up Fairfield Inn & Suites in Northwest Houston.
June 30, 2008
Managing the boundary easement audit, exterior envelope remediation, and Wyndham PIP scope to convert an operating Days Inn into a Super 8 in the Greater Houston Area.
April 18, 2008
Reviewing the ground-floor architectural prototype for a Four Points by Sheraton build, separating back-of-house service circulation from open-concept lobby, bar, and meeting spaces.
March 24, 2008
Auditing the architectural blueprint set and franchise PIP requirements for a 120-key full-service Holiday Inn, balancing ground-floor banquet circulation, vertical plumbing stacks, and central plant loads.
February 10, 2008
Managing architectural space planning, ballroom interior renovations, and commercial HVAC engineering for a full-service Holiday Inn hotel tower.
January 15, 2008
Executing forensic architectural plan takeoffs, structural space planning, and MEP coordination for a multi-story select-service hospitality asset on the Texas Gulf Coast.
August 20, 2007
Converting an industrial warehouse into the AIM Limousine Services fleet maintenance facility, dispatch center, and secure vehicle staging yard.
August 20, 2007
Directing IHG full-service hotel prototype feasibility, signature Holidome indoor recreation spatial planning, commercial banquet kitchen layout, and structural frame engineering across a regional commercial lodging corridor.