June 29, 2016 · Materials
Separating custom guestroom casegoods, Lexmark carpet yardage, and public-area quartz breakfast tables for a 60-key Quality Inn renovation in Atlanta, Georgia.
June 23, 2016 · Materials
Redlining 31-page factory cabinet and granite shop drawings down to SKU-level carton staging on a 39-room Choice brand conversion in East Houston.
May 31, 2016 · Construction
Reconciling revised architectural, structural, MEP, civil, and fire-code permit sheets against original as-built drawings for a 14,308-square-foot multifamily rebuild in North Houston TX.
May 30, 2016 · Construction
Engineering a 99-key, 58,105-square-foot four-story La Quinta Del Sol hotel with an indoor pool and permitting revisions in West Houston, Texas.
May 3, 2016 · Construction
How an eight-story, 72-room Hampton Inn Property Improvement Plan in Northern Illinois turned 77 brand inspection items into a sequenced FF&E and architectural trade scope.
March 22, 2016 · Materials
Auditing architectural specification books for a Best Western public space renovation, unbundling commercial millwork, and sourcing contract finishes directly.
March 11, 2016 · Systems
Five-page non-transferable Property Improvement Plan breaking down brand compliance and 23-seat breakfast room standards for a 57-key Country Inn & Suites in Georgia.
January 27, 2016 · Construction
Restoring a vehicle-damaged porte-cochere lobby roof and executing a full exterior framing, roofing, siding, and drainage overhaul in Fort Bend County, Texas.
January 22, 2016 · Construction
Multi-phase BES Property Improvement Plan, construction proposal, and 96-key Formula Blue FF&E conversion bid for an airport-area Comfort Suites in North Houston TX.
January 17, 2016 · Materials
Separating knocked-down birch plywood vanity millwork, Cardiff Cream quartz counters, and custom 42-key guestroom casegoods keeps freight volume down on midscale hotel rehabs.
December 15, 2015 · Construction
Synchronizing architectural, structural wind-load, civil drainage, and MEP sheet schedules on a four-story Wingate by Wyndham new-build on the Texas Gulf Coast.
November 30, 2015 · Materials
Direct out-of-state specialty wall-sconce fulfillment and rapid freight dispatch from Houston for the Wolcott Hotel in New York.
November 27, 2015 · Materials
Organizing Design Excellence exterior, guest-corridor, and public-area submittal binders alongside a four-floor room-type matrix for Best Western Southwest Houston Suites.
November 2, 2015 · Underwriting
Structuring a 224-key Crowne Plaza acquisition PIP spanning a 10-story tower, exterior corridor wing, 4,906 sq ft of meeting space, and full guestroom upgrades in Central Texas.
October 23, 2015 · Construction
Coordinating a 105,766-square-foot, six-story Holiday Inn Express build over a concrete basement parking podium through West Houston city and fire permit review.
October 14, 2015 · Materials
Translating visual finish boards into a room-by-room FF&E, quartz vanity, drapery, lighting, and corridor takeoff for a 59-key Super 8 renovation in Buffalo, NY.
September 21, 2015 · Systems
Four-page Brand Entry Standards (BES) conversion Property Improvement Plan for reflagging a former Hampton property into a Comfort Inn in Ohio.
September 10, 2015 · Materials
How isolating 85 vanity assemblies and ordering a three-piece sample surround kit protected schedule certainty against a 90-day post-approval shipping window.
September 9, 2015 · Materials
Sourcing and installing a matched three-piece GE stainless steel kitchen appliance package under a single direct order for a residential renovation in Houston, Texas.
September 9, 2015 · Materials
Structuring a 102-room select-service casegoods package across 45 King and 57 Queen layouts with direct container sourcing and a 14% freight load.
September 7, 2015 · Materials
Separating field-verified flooring estimates from factory-ordered casegoods and lighting across a 51-key Super 8 renovation in Central Iowa keeps procurement schedules tight.
July 27, 2015 · Materials
Procuring and scheduling direct wholesale delivery of two custom frameless glass shower enclosures for a residential bath build in Fort Bend County, Texas.
July 23, 2015 · Materials
Direct-sourcing a 100-fixture Gatsby guestroom wall sconce and table lamp replenishment order for an Americas Best Value Inn in South Carolina.
July 21, 2015 · Construction
Coordinating a 94,556-square-foot, four-story Staybridge Suites Prototype 6.0 build across 135 extended-stay units and full multi-discipline construction sheets in West Houston TX.