March 11, 2019 · Construction
Hyatt Place 96-Key Five-Story Construction & FF&E Bid: Austin, TX
Coordinating a 100-sheet five-story architectural drawing package with a 96-key Series 300 guestroom and public-area FF&E quotation in Austin, Texas.
Notes from projects in Austin: hotel construction and FF&E bids, cabinetry packages shipped by the container, a fuel station lease, and the valuation of a downtown property.
March 11, 2019 · Construction
Coordinating a 100-sheet five-story architectural drawing package with a 96-key Series 300 guestroom and public-area FF&E quotation in Austin, Texas.
May 19, 2015 · Materials
Engineering 79 suites of frameless Shaker kitchenettes, wet-bar bases, ADA vanities, and quartz tops into three 40-foot high-cube containers for a Staybridge Suites in Austin.
February 3, 2014 · Construction
Breaking down 97 extended-stay suites across 15 unit matrix columns and 65,557 square feet of enlarged room layouts for a Staybridge Suites bid in Austin.
August 12, 2008 · Underwriting
Valuing an urban core Super 8 property by underwriting in-place economy lodging cash flow alongside long-term high-density land redevelopment optionality.